I have no new photos, so here's an idea of what things look like.
Wednesday, May 6, 2009
typos. stagnation.
Nick pointed out the fact that my entries are riddled with typos, and that there are entire words missing from sentences, to which I say: what the hell do I care? I've lost all morale, and I still don't have a toilet. I've been waiting so long on this remodel that fucking Domino folded in the meantime.
I have no new photos, so here's an idea of what things look like.
I have no new photos, so here's an idea of what things look like.
Friday, April 24, 2009
Thursday, April 23, 2009
Phase Two: Nothing is happening.
1. there is no toilet here. i don't know what this means for my construction guys, although there is a starbucks cup filled with yellowish-brown liquid in the kitchen...
2. i am on the verge of dying of sheetrock dust inhalation.
3. all i have to look forward to every morning, when i first arrive, is to stare at my half naked neighbor, who likes to do his morning stretches in front of his window.
also, a tip for the ladies: buy your tiles while you are wearing a dress but covered in dust. the salesman will think this is cute and give you the contractor's price.
2. i am on the verge of dying of sheetrock dust inhalation.
3. all i have to look forward to every morning, when i first arrive, is to stare at my half naked neighbor, who likes to do his morning stretches in front of his window.
also, a tip for the ladies: buy your tiles while you are wearing a dress but covered in dust. the salesman will think this is cute and give you the contractor's price.
Wednesday, April 15, 2009
Phase One: demo.
cost of demolition: one PBR and a basket of buffalo wings at Brother Jimmy's for Jonathan, plus $40 gas money for 5 trips to a dumpster.

check out my gorgeous stove. the base cabinets were literally torn off the wall with J-Law's bare hands. he's an effing beast.

parquet floors were removed with a single hammer and chisel by yours truly. it was a three day project and came at the price of a pinkie joint that now locks from time to time. the staircase was sold to an exotic dancer who needed a ladder to her VIP room. really.

gutted bathroom: spent one afternoon removing the old tiles. next, i found the studs and went to town on the sheetrock with a crowbar. (i like saying studs.) my only protective gear was a pair of swim goggles from k-mart.

check out my gorgeous stove. the base cabinets were literally torn off the wall with J-Law's bare hands. he's an effing beast.

parquet floors were removed with a single hammer and chisel by yours truly. it was a three day project and came at the price of a pinkie joint that now locks from time to time. the staircase was sold to an exotic dancer who needed a ladder to her VIP room. really.

gutted bathroom: spent one afternoon removing the old tiles. next, i found the studs and went to town on the sheetrock with a crowbar. (i like saying studs.) my only protective gear was a pair of swim goggles from k-mart.